EVRAZ
- Evraz subsidiaries are located in 19 time zones.
- Evraz annual railway shipments equal 45 million tonnes of raw materials and steel products.
- For 75 years KMK steel workers have produced the rails enough to turn round the Earth 23.5 times.
- 2010
-
Investor presentation, July 2010 (PDF | 1004Kb)
Uploaded 26.07.2010 -
Investor presentation, June 2010 (PDF | 1001Kb)
Uploaded 08.07.2010 -
Bank of America Merrill Lynch Global Metals and Mining Conference, Miami, 12 May 2010 (PDF | 307Kb)
Uploaded 12.05.2010 -
Corporate Presentation, Non-Deal Roadshow, Europe and the USA, 5-9 April 2010 (PDF | 1.01Mb)
Uploaded 07.04.2010 -
Deutsche Bank 8th Annual Russia One-on-One Conference, London (PDF | 1023Kb)
Uploaded 29.01.2010
-
- Archive 2009
- Archive 2008
- Archive 2007
- Archive 2006
- Archive 2005
-
- 02.09.2010 | File
- 1H 2010 Conference Call
Download (MP3 | 14.84Mb)
-
- 02.09.2010 | File
- 1H 2010 Press Release
Download (PDF | 96Kb)
-
- 02.09.2010 | News
- Evraz Announces Interim Results for 1H 2010
-
- 26.08.2010 | News
- Notice of 1H10 Results and Conference Call Details


